**Please open this site in google chrome and enable JavaScript for better experience.

Tuesday 30 May 2017

Major project - Automatic railway gate control

Description :-

In this project we show that how we use microcontroller  to control the working of the auto opening of railway fatak and auto shut down the railway fathak. In this project we show different logical circuit.
1.     Auto opening of the railway fathak.
2.     Auto tracking  path indicator.
In this project we use  one toy train as a moving train. One stepper motor to opening and closing of the railway fathak. Few reed sensor to sense the position of the path indication. And one LCD which show status of train. 
   One microcontroller 8051 with 40 pin base. In this project we use 89s51/52 microcontroller as a main processor. Pin no 40 of this ic is connected to the positive supply. Pin no 20 is connected  to the ground pin. LCD is connected  to the port P0. Here we use 2 by 16  lcd for display all the  station one by one. One reset pin for the  auto reset the microcontroller when power is on. ON the reset pin we use One capacitor and resistor circuit . We use 10 mfd capacitor and 10 k ohm resistor for the reset signal..
All the reed sensor is connected to the port P1. second point of the reed sensor is connected to the  ground pin. One magnet is paste on the train  When train move on the track then reed sensor activate automatically. And processor sense this signal  and then display on the lcd. Opening and closing of the railway fathak is also control by the reed sensor.


Stepper motor is connected to the port p2. For the stepper motor we require total four output. Output of the stepper motor is converted into positive with the help of the ic 4049. 
Screenshot in proteus  :-



This project is prototype of railway signaling and tracking which show how we can track and reduces the accidents on railway crossing and manage railway at very low cost.
In this project we use Atmel 89s52 microcontroller, seven reed sensors, leds,  11.05Mhz crystal oscillator , one LCD screen, a center tap transformer with two diods and 7805 for +5V regulated power supply, one motor for control fathak(gate) and ULN2003A with not gate ic for drive motor .These component are used in the circuit and circuit diagram is shown in above figure.
          The regulated power supply give 5V dc supply to the circuit and micro controller .The reed sensor is use to check the status of train and there is a magnet connected in the wheel of train and fathak(gate) is in between two reed sensor (reed 6 and reed 7) .When is on reed sensor no. 6 the sensor give high pulse on port no. P1.6 and the gate is closed and by default LCD show “Gate close” .And when train is on sensor no. 7 then micro controller get high pulse on port P1.7 and the gate is open and LCD show “Gate open” .Similarly at different different reed sensor LCD show “Station 1,2,3 and so on…..” .By this system we can manage railway much efficiently at low cost.
  


Password :- www.gtbpinstitute.blogspot.com
Download project report:-

Download ppt:-

Download ppt:-

Download project code with design:-


Wednesday 3 May 2017

Download BTE polytechnic Datesheet 2017

B.T.E DELHI Polytechnic Exam Date sheet 2017



Delhi board of technical education exam dates has been released 




Tuesday 2 May 2017

Free download Industrial Management Notes


1. Industrial management


2. Finential  management


3. Industrial safety


4. Marketing 


Free download Advance Communication System Notes




1. Introduction


2. Wireless system and network's


3. Electronic Exchange & DTC


4. Spectrum Tech., CDMA